Bucket pointed vault, half dome and segmental vault
This room has been built above the present office of the Auroville Earth Institute and is the bedroom of Satprem Maïni, director of the Auroville Earth Institute.
Bucket pointed vault, as the bedroom for the house of Satprem Maïni
Bedroom with a half bucket pointed dome |
This vault combines the difficult stability of a pointed arch and bucket one. The stability requirements between a vault and a dome for this kind of shape are different: The vault requires a bottom thickness of 36.5 cm, which decreases till 11.5 cm at the top, and it needs a keystone of a specific weight. But the dome can be started with only 29 cm thickness, which reduces progressively till 7 cm at the apex, and it does not need any keystone.
This arch shape has been used for doing apses of a rectangular room, which has been covered with a segmental vault.
The segmental vault was built with vertical courses. The bucket pointed vault and dome presents these features: • 2.42 m span, 2.42 m rise, 1.65 m long, 29 to 7 cm thick for the dome and 36.5 to 11.5 cm thick for the vault. • They have been built free spanning with horizontal courses
|
>Laying the blocks of the arch on the window frame as a centring
|
Laying the blocks in the corner and puling the string line
|
Puling the string line to check if the block of the arch is well laid
|
Building the arch symmetrically
|
Puling the string line and checking the block of the archs
|
Building the arch symmetrically
|
Completing the arch
|
Laying the last blocks above the arch
|
Removing the window frame, used as a centring
|
Starting the bucket pointed vault
|
Laying blocks of the bucket pointed vault
|
Laying a triangular mortar
|
Stability limit with the horizontal courses
|
Laying the first keystones
|
Laying keystones
|
Completing the vault
|
Vault completed
|
Starting the dome with 29 cm thick blocks
|
Building the dome
|
Completing the dome
|
Half dome completed
|
Starting the segmental vault
|
Laying stepped courses of the segmental vault
|
Laying blocks above the string lines
|
Segmental vault in progress
|
Joining the segmental vault with the adjacent vault
|
Joining the vaults
|
Gap left for ventilation
|
Coping for the waterproofing, before laying the ferrocement cover
|
Completing the segmental vault on the other side
|
Bucket pointed vault completed
|
Bedroom (Bucket pointed vault) living room (equilateral vault)
|
Bedroom from inside
|